Concrete Floor For Building 2025
- E

- Aug 18, 2025
- 1 min read
This project was a long time in the making. The original estimate was sent out back in the winter of early 2025, but we finally brought it to life this summer. The client needed a strong, long-lasting concrete floor for a new building, and we worked closely with the builders to ensure everything came out exactly as it should.
The floor was poured at a 5-inch thickness with rebar placed every 2 feet, giving it exceptional sturdiness and durability. After pouring the slab, our crew returned a few hours later to cut in the crack-control joints, ensuring the surface will stay looking sharp and structurally sound for years to come.
This job was simple in design but executed with precision. By coordinating with the building team, we made sure everything met spec and aligned perfectly with the larger construction process. Both our team and the client are confident that this floor will stand strong for decades—and the client couldn’t have been happier with the final result.